If you are looking for software to use, go to Huajun Software Park! software release

Hello, if there is a need for software inclusion, please package the software and attach the software name, software introduction, software-related screenshots, software icon, soft copy, and business license (if you do not have a business license, please provide the front and back of the corresponding developer ID card) and a photo of yourself holding your ID card) and send it to your email http://softwaredownload4.com/sbdm/user/login

Hide>>

Send to email:news@onlinedown.net

Hide>>

Location: front pageTable sampleSample templateHuman resources administration Measures for the technical and economic management of power grid and electric capital construction projects
Measures for the technical and economic management of power grid and electric capital construction projects

Measures for the technical and economic management of power grid and electric capital construction projects

QR code
  • Software licensing: free software
  • Software size: 0.03MB
  • Software rating:
  • Software type: Domestic software
  • Update time: 2024-10-31
  • Application platform: Winxp/vista/win7/win8/2000/2003
  • Software language: Simplified Chinese
  • Version:

Download the service agreement at the bottom of the page

Software introduction Related topics FAQ Download address

Basic introduction
Measures for the Technical and Economic Management of Power Grid and Electric Power Capital Construction Projects Section 1 Logo
Measures for the technical and economic management of power grid and electric capital construction projects

1 scope

This standard specifies the general working procedures and requirements for the technical and economic management of electric power capital construction projects.

This standard applies to the technical and economic management of XX power grid 35 kV and below transmission, transformation and distribution projects and urban and rural power grid construction and transformation projects.

2 Normative reference documents

The provisions in the following documents become provisions of this standard through reference in this standard. For dated reference documents, all subsequent amendments (excluding corrigenda) or revisions do not apply to this standard. However, parties to an agreement based on this standard are encouraged to study whether the latest versions of these documents can be used. . For undated referenced documents, the latest edition applies to this standard.

FAQ

Measures for the technical and economic management of power grid and electric capital construction projects

Measures for the technical and economic management of power grid and electric capital construction projects

closure