Software features
Powerful real-time remote database support
The physical quantity calculation data is called via the network to facilitate users to obtain the required data at any time.
Remote support for price databases such as the "Luban Tong" database ensures that users can obtain the latest market price information.
Enterprise quota database and cost indicator network remote support helps enterprises achieve unified management of quotas and cost indicators.
BIM-based four-dimensional engineering quantity and cost view
The earliest graphical visualization cost product launched in China allows users to intuitively understand project quantities and costs.
Fully compatible with Luban calculation engineering files to ensure data accuracy and consistency.
Generate a project image progress budget, reflect material usage according to progress, and help users better control costs and progress.
Program management
Unified management of bidding sections, individual projects, and unit projects facilitates users to control the overall project.
Supports simultaneous management of multiple construction sites to improve management efficiency.
Whole process cost management
Tender documents, progress review budget documents, and settlement documents can be managed uniformly, and data comparisons can be made to help users better understand changes in project costs.
Provides management of construction contracts, payment vouchers, construction changes and other project attachments to ensure that users can view and manage relevant documents at any time.
Full-process management cloud applications for cost estimation, bidding, visa management, payment, etc. help users achieve full-process cost control and management.
Cloud application
The cloud intelligently pushes the list quota database, market prices, project templates, and fee withdrawal templates to facilitate users to obtain the resources they need at any time.
The market price in the cloud price library can be called to ensure that users can obtain the latest market price information.
More project templates can be downloaded directly through cloud applications to improve users' work efficiency.
Software function
BIM modeling and calculation
Provide professional BIM modeling tools to support the modeling and calculation of a variety of building components.
Engineering quantity data can be automatically associated during the modeling process to facilitate users’ subsequent cost analysis and control.
Construction progress management
Compile and manage all progress plans in the data background, and use bar graphs and network diagrams to display progress.
Add the time dimension to the BIM model to achieve visual management of construction progress.
Quality management
Provides a quality management module to support the preparation, approval and execution of quality plans.
Quality issues can be rectified and tracked to ensure project quality compliance.
Security management
Provides a safety management module to support the preparation, approval and execution of safety plans.
Safety hazards can be investigated and rectified to ensure the safety of the construction site.
cost management
Provides a cost management module to support the preparation, approval and execution of cost plans.
Costs can be calculated and analyzed to help users better understand changes in project costs.
Collaborative management
Provide a collaborative management platform to support information sharing and collaborative work among project parties.
Can manage the workflow in the project and improve work efficiency.
Smart construction site
Use BIM, sensors, Internet of Things, cloud computing, big data and other information technologies to integrate projects on the same platform.
Realize the visualization and intelligence of project management and improve management efficiency.
FAQ
Adjustment of earthwork depth for excavation of foundation pit or trench after large excavation
Problem description: A large excavation has been carried out, and some parts require excavation of foundation pits or foundation trenches. However, the depth of the earthwork automatically generated by the software always reaches the outdoor floor, while the actual depth of further excavation only needs to reach the bottom elevation of the large excavation.
Solution: In Luban software, as long as the position of the components is correct, the amount of excavation work will be automatically deducted from the amount of large excavations when calculating the excavation, and no double calculation will occur, so there is no need to adjust the height separately.
Decoration drawing problem of concealed columns in steel bar introduction graphics in frame-shear structure
Problem description: In the frame-shear structure, after the steel bars are imported into the graphics, the decoration of the concealed columns cannot be drawn.
Solution: The wall decoration in the software will automatically identify the pillars and attach to them, eliminating the need to manually draw the decoration of hidden pillars.
Luban software update log:
1: Brand new interface, refreshing, simple and efficient
2: Performance is getting better and better
Huajun editor recommends:
Looking around, there are software similar to this software everywhere on the Internet. If you are not used to this software, you might as well give it a try.Future list pricing,Fang Guanjia ERP real estate agency management software,Concrete mix ratio calculator,Southern total station transmission software,Changfeng rental softwareWait for the software, I hope you like it!





















Your comment needs to be reviewed before it can be displayed