If you are looking for software to use, go to Huajun Software Park! software release AI product list

Hello, if there is a need for software inclusion, please package the software and attach the software name, software introduction, software-related screenshots, software icon, soft copy, business license (if you do not have a business license, please provide the front and back of the corresponding developer ID card and a photo of yourself holding the ID card), and send it to email http://softwaredownload4.com/sbdm/user/login

Close >>

Send to email:news@onlinedown.net

Close >>

Location: Home pagePC softwaremanagement softwareEngineering construction Future list pricing
Future list pricing

Future List Pricing 6.1.5 Official Version

QR code
  • Software licensing: free software
  • Software size: 176.4MB
  • Software rating:
  • Software type: Domestic software
  • Update time: 2024-12-30
  • Application platform: winall
  • Software language: Simplified Chinese
  • Edition: 6.1.5 Official version

Download the service agreement at the bottom of the page

Software introduction Related topics FAQ Download address

Basic introduction
Future list pricing section first LOGO
The future list pricing software is a professional and efficient project list pricing tool. The official version of the future list pricing software has powerful functions and is built according to the latest national pricing specifications and local cost regulations. It can help users easily manage project pricing. The latest version of the future list pricing software is convenient and easy to use, and can be perfectly integrated with the future measurement and reinforcement software, making it easier to import project files.

Screenshot of future list pricing

Features of future list pricing software

The interface is simple, the process is clear, and the operation steps are simple, making it easy for both new and old users to learn and use;

Adopting the mainstream office interface style, the function menu is centralized and classified, making it easy to find;

The project directory tree, title/list/quota, work and materials composition, etc. are managed hierarchically and can be expanded/folded for viewing as needed;

The running speed has been greatly improved. From program installation to interface switching, cost calculation, bidding data import/export, etc., the response speed has reached the "second" level, which is much better than similar products;

The main interface display content supports personalized customization, and the operator can set his own work interface according to different roles;

It has a powerful batch operation function, which can perform conversion operations on multiple lists/quotas or multiple unit projects at one time, such as converting labor and materials, changing rates, modifying unit prices, etc.;

Projects with different tax calculation methods (general tax calculation and simplified tax calculation for business tax and value-added tax) can be compatible with each other. For example, copying between projects, taking the market price of the project, etc. are not affected by the tax calculation method;

​​​​Import/export multiple formats of bidding documents, bidding control price documents, and bidding documents with one click.

Provides "double compliance check" function before and after exporting bidding documents.

Pre-export inspection: The software provides a pre-export inspection function for bidding/bidding documents. The inspection items and error prompts are clear at a glance, and can be quickly modified according to errors to avoid repeated export inspections.

Post-export inspection: Provides a re-verification and inspection function for bidding/bidding documents to completely eliminate errors.

Provides a variety of price adjustment methods, which can be adjusted by batch adjustment of unit price, content, coefficient, etc., or you can directly enter the target cost for adjustment.

Perfect integration of measurement and reinforcement - the software can not only directly import the "Future BIM Measurement and Reinforcement Integration" project files to generate the cost, but also the imported project can perform the "unit project staging" operation, that is, within the unit project, select some components of the project again and automatically generate a new unit project and cost;

Reports can be directly exported to Excel or PDF format.

Future list pricing software installation steps

​​ 1. Double-click to run the installation package downloaded from this site and click Next

2. Check 'I agree to the terms of the license agreement'

3. Select the installation location

4. Installing

5. Installation completed

Future List Pricing Software FAQ

How to carry out project engineering management?

​​ 1. New project/single item/unit project

Click [New] in the [Start] menu to pop up the "New Wizard" dialog box, fill in the basic information of the project.

In addition to filling in the basic information of the project, the corresponding "tax calculation method" (general VAT calculation, simple VAT calculation, business tax) and "project purpose" (divided into bidding/controlled price, bidding, and pre-settlement modes) should be selected based on the actual situation of the project.

​​Description of project purpose:

"Bidding/Controlled Price" mode: The tenderer selects this mode when preparing the bidding list and preparing the bidding control price;

“Bid” mode: This mode is used by bidders when preparing bid quotations;

"Pre-settlement" mode: If you only prepare pre-settlement and do not make bidding quotations, select this mode;

The purpose of the project can be switched in the "Project Overview"; the functions provided by the software are different in different modes.

After completing the filling, click the "Next" button to enter the new single project and unit project interface:

Fill in the individual project number, individual project name, unit project name and other information, and select "Quota Type" and "Bidding Area".

After clicking "Finish", the software automatically expands the newly created project structure and automatically locates the operation interface of "Partial Project Quantity List", as shown in the figure:

In the software, projects are arranged in a tree directory from "Project → Single Project → Unit Project". Each unit project consists of a list of sub-projects, measure projects, other projects, etc., as well as a unit project summary table, a single project summary table, and a project summary table. Click on different directory locations, and the software will present different operation interfaces.

Project directory tree:

2. Single project operation

① New single project:

​​Select the project name, right-click the mouse, select "New Single Project" on the pop-up function menu, and enter the name of the new single project on the pop-up "New Single Project" dialog box;

→→→

Screenshot of future list pricing”, the newly created single project will appear in the project directory tree.

② Delete a single project:

​​Select the name of the single project that needs to be deleted, right-click the mouse, and select "Delete Single Project". At this time, a prompt box pops up to confirm deletion, select [Yes], and the single project will be deleted.

​ ​ Warm reminder: If the deleted single project contains unit projects, the unit projects contained in it will also be deleted.

③ Copy a single project:

​​Select the single project to be copied, right-click the mouse, and select "Copy the current single project" on the pop-up function menu. Then place the cursor on the project name, right-click the mouse, and select "Paste single project" on the pop-up function menu.

3. Unit engineering operations

① New unit project:

After selecting the name of a single project, right-click the mouse and select "New Unit Project" on the pop-up function menu. A new unit project window will pop up. Please enter the project information according to the name of each field, select the quota type and confirm, and the new creation is completed, as shown in the figure:

② Copy unit project:

​​Select the unit project to be copied, right-click the mouse, and select "Copy Unit Project" on the pop-up function menu; place the cursor on the name of a single project, right-click the mouse, and select "Paste Unit Project" on the pop-up function menu.

③ Copy unit project across projects:

​​Select the unit project to be copied, right-click the mouse and select "Copy Unit Project", open another project file, place the cursor on the individual project name of the file, right-click the mouse and select "Paste Unit Project".

④ Delete unit project:

​​Select the name of the unit project that needs to be deleted, right-click the mouse, select "Delete Unit Project" on the pop-up function menu, select "Yes", and the unit project will be deleted.

4. Modify project/single/unit project overview

Right-click the project project/single project/unit project in the project directory tree and select "Project Overview" on the pop-up menu. The software will pop up "Project Overview" in the window under the project directory tree.

You can edit and modify the content as needed.

5. Engineering recycling bin

Right-click the project project/single project/unit project in the project directory tree and select "Project Recycle Bin" on the pop-up menu. The software will pop up "Project Recycle Bin" in the window under the project directory tree.

You can restore the deleted project nodes by right-clicking on the deleted project and selecting "Restore".

Future list pricing software update log

​​ 1. Fix bugs in the previous version

2. Optimize some functions

Huajun editor recommends:

Believe me, as long as you use Future List Pricing, you can uninstall other software and it will definitely meet all your needs. The editor has also carefully prepared for youFang Guanjia ERP real estate agency management software,Concrete mix ratio calculator,Southern total station transmission software,Aiyifang login platform,Changfeng rental software


FAQ

Future list pricing

Future List Pricing 6.1.5 Official Version

Close