Project evaluation report sample content
(1) Necessity. Necessity evaluation is also called background analysis, which is to analyze the significance and status of the project in scientific research and economic construction, so as to clarify whether the construction of the target project is necessary. In this regard, it will focus on evaluating two sub-indicators
1. Investment direction of the project
2. Market demand for the product
(2) It is feasibility. That is to examine whether the project is possible to construct. The feasibility study of a construction project should include eight aspects
①Market demand survey and analysis
②Scale of proposed construction or reconstruction and expansion
③Research on technical process equipment and production conditions
④Factory site plan and factory construction conditions
⑤The source and quality of labor force and employee business and technical training
Project evaluation report sample closing content
(1) Natural ending. If the main part has clearly stated the point of view and made a clear conclusion, there is no need to add a tail.
(2) Conclusion. In order to deepen the reader's impression, deepen the main idea, summarize the previous article, once again emphasize the views on things after investigation and analysis, and make a conclusive ending.
(3) Revelatory ending. After writing the main facts and analysis conclusions, if there are still some issues or situations that need to be pointed out to arouse readers' thinking and discussion, or to show the development trend of things and point out the direction of efforts, you can write an enlightening ending.
The editor recommends:
The project evaluation report sample is a free template. You can download the source file for you to edit, modify and replace. Huajun Software Park also providesAudit case analysis report sample,Human resources analysis report sampledownload.
it works
it works
it works