The purpose of using construction schedule planning software is to control time and save time. The schedule chart clearly indicates what work must be completed by when and the time required to complete each task. This determines the importance of schedule planning in project management.
1. Draw network diagram form:
Network diagrams and bar diagrams.
2. Functional features:
1. Completely anthropomorphic operation, drag the mouse to complete the drawing of the schedule, and nodes, numbers, and key lines are automatically generated in real time.
2. Humanized design, providing complete drawing and modification methods, network diagram and bar chart modes, which can be switched at will.
3. Automatically calculate the conversion and adjustment of key lines, free time difference, front-end, back-end, and total time difference.
5. The drawing process is simpler and more convenient than drawing with pen and paper. Various parameters are automatically calculated, and work and node positions are automatically arranged.
6. Can output double-code network diagrams, horizontal bar diagrams, resource occupation diagrams, etc.
7. The work start and end time can be modified at will to better adapt to the user's operating habits.
8. Powerful resource map drawing and setting functions to meet various drawing needs of users.
3. Promotional price: 980 yuan.
4. Product list:
Please confirm that the software product you purchased should have the following parts:
Software manual, dongle, software CD, after-sales service card, exquisite product packaging box, and free 900 yuan construction industry card.





















Useful
Useful
Useful