Hello, if there is a need for software inclusion, please package the software and attach the software name, software introduction, software-related screenshots, software icon, soft copy, and business license (if you do not have a business license, please provide the front and back of the corresponding developer ID card) and a photo of yourself holding your ID card) and send it to your email address http://softwaredownload4.com/sbdm/user/login

Close >>

Send to email:news@onlinedown.net

Close >>

Location: front pagePC softwaremanagement softwareEngineering construction Schedule Excel Add-in
Schedule Excel Add-in

Schedule Excel Plug-in 9.0

QR code
  • Software licensing: shareware
  • Software size: 85.81MB
  • Software rating:
  • Software type: Domestic software
  • Update time: 2024-10-31
  • Application platform: WinAll
  • Software language: Simplified Chinese
  • Version: 9.0

Download the service agreement at the bottom of the page

Software introduction Related topics FAQ Download address

Recommended for you:- Schedule Excel Add-in

Basic introduction
Progress plan Excel plug-in section first LOGO
The schedule plan Excel plug-in runs in the Microsoft Office Excel environment. Its main function is to automatically form a Gantt bar chart and a planned actual bar chart, a work calendar, and a double-code network diagram based on the project work time in the Excel form (can be set to be based on the work time). size automatically adjusts to width).

It can read Ms Project, primavera (xer, xml, sql, oracle, sqlite), asta powerproject, planner and other project files, and form bar graphs and double band number network diagrams in Excel, and can also export to Project and primavera files. , the horizontal bar diagram can be exported to Word and CAD files, and the double code diagram can be automatically formed and exported to CAD files.

The time scale can be set to year, quarter, month, week, day, 6 hours, 3 hours, hours, 10 minutes, minutes;

You can hide certain days of the week and any hour of the day.

Using Excel for schedule planning greatly increases the flexibility of schedule drawing.

This plug-in must run on Microsoft Office Excel 2007 and above, and Microsoft .Net Framwork 3.5 and above.

The installation package is divided into 32-bit version and 64-bit version. Choose the version to install according to the Windows operating system.

After the installation is complete, restart Excel, click "New Schedule" on the Excel start menu, and the "Progress Plan" tab will appear on the Excel tab.

Changes to 8.0:
1. Add a custom graphic style for double-coded horizontal bars;
2. Add horizontal bar and double code text settings;
3. Add double code floating time settings;
4. Upgrade and read files from other project management software;
5. Fix some errors.