Function introduction
A new one-click function is added to calculate whether the measured points in the tunnel are over or under dug. This eliminates the trouble of calculating by hand. It is a powerful tool for tunnel construction. Tunnel over- and under-excavation coordinate conversion has been integrated, and automatic calculation of datum coordinates has been added.
This time, the batch calculation of the vertical curve elevation of the entire line has been added, allowing this program to calculate the three-dimensional coordinates of the entire line at once.
In addition, this program can calculate incomplete transition curves. It is no longer necessary to compose a complete transition curve and then calculate it. It has a new function of inverting mileage from coordinates.
Functions include vertical curve calculation, picking up CAD coordinates and recording, drawing assistant function, forward and reverse calculation of coordinates, and conversion tools for degrees, minutes and seconds. The calculated coordinates can be drawn in CAD to verify the correctness of the coordinate calculation, so that you will not be confused at work. Something went wrong.
Basic introduction
One-click calculation of over- and under-excavation of actual measured points in the tunnel, and one-time calculation of the three-dimensional coordinates of the entire line (the number of curve segments is not limited, the length of the route is not limited, and the line type is not limited (straight line, circle, complete, non-complete, pre- and post-easing) Curve)), batch calculation and single point calculation, any point coordinates to calculate the center pile and side pile coordinates, batch calculation of vertical curve elevation, etc., all kinds of functions are available, one software is in hand, and measurement is worry-free.
it works
it works
it works