If you are looking for software to use, go to Huajun Software Park! software release

Hello, if there is a need for software inclusion, please package the software and attach the software name, software introduction, software-related screenshots, software icon, soft copy, and business license (if you do not have a business license, please provide the front and back of the corresponding developer ID card) and a photo of yourself holding your ID card) and send it to your email http://softwaredownload4.com/sbdm/user/login

Hide>>

Send to email:news@onlinedown.net

Hide>>

Location: front pagePC softwaremanagement softwareEngineering construction Zhuye Coal Construction Project Budget List Software
Zhuye Coal Construction Project Budget List Software

Zhuye Coal Construction Project Budget List Software 2017 Edition

QR code
  • Software licensing: shareware
  • Software size: 115.87MB
  • Software rating:
  • Software type: Domestic software
  • Update time: 2017-02-20
  • Application platform: WinAll
  • Software language: Simplified Chinese
  • Version: 2017 edition

Download the service agreement at the bottom of the page

Software introduction Related topics FAQ Download address

Basic introduction
Zhuye coal construction project budget list software section first LOGO
1. Including quota:

Coal construction tunnel project budget quota (2007 base price), coal construction tunnel project consumption quota (2007 base price), coal construction tunnel project auxiliary basic quota (2007 base price), coal construction tunnel project auxiliary fee comprehensive quota (2007 base price) , coal construction ground construction project consumption quota (2007 base price), coal construction mechanical and electrical installation project consumption quota (2007 base price), coal construction special well-drilling project consumption quota (2007 base price), coal construction special well-drilling project comprehensive quota (2007 base price) ).

Relevant regulations on coal construction project cost quotas and cost management, coal construction project bill of quantities items and calculation rules.

Comprehensive budget quota for coal construction tunnel project auxiliary fees (99), coal construction tunnel project auxiliary fee comprehensive budget quota (99), coal construction tunnel project budget quota (99), coal construction project basic quota (99), coal installation Basic project quota (99), coal tunnel project basic quota (99).

The national unified municipal engineering budget quota (2000), the national unified installation project budget quota (2000), the national unified building decoration project consumption quota (2002), the national unified antique garden budget quota (2001), the national unified installation project budget quota ( 2001), national construction project budget quota (95).

2. Basis for preparation:

According to the document of the China Coal Construction Association (China Coal Construction Association [2007] No. 90), the notice on the release of the "Coal Construction Project Quantity List Items and Calculation Rules", various project consumption quotas and relevant regulations on project cost management. The notice stipulates that calculation rules, consumption quotas, charging standards and management regulations shall apply to new construction, reconstruction and expansion projects in the coal industry and shall be effective from January 1, 2008.

Notice on Issuing the "Measures for Adjusting the Pricing Basis for Coal Construction Projects in Replacement of Business Tax with Value-Added Tax in the Construction Industry" - China Coal Construction Association (2016) No. 46

China Coal Construction Association Document No. 72, Coal Construction Association Zi [2011] Notice on the issuance of the "Coal Construction Project Cost Quota" and "Coal Construction Other Cost Regulations" (revised).

|Notice on Adjusting the Quota Labor Unit Price for Coal Construction Projects-China Coal Construction Association [2012] No. 54

3. Software features:

1. The software automatically brings out the preparation basis, tunnel technical characteristics, charging standards, altitude adjustment, etc.

2. Can complete lock replacement at high altitude, conversion of explosive power, resin roll content, wellbore clear diameter section, etc.;

3. Able to complete secondary analysis of special materials such as wind, wood products, metal brackets, etc.

4. There are different recording methods for measure project expenses in 2007 and 2011;

5. Can complete the calculation of auxiliary compensation fees incurred during operations such as caving, pre-grouting, methane exploration, water exploration, water and electricity outage, support operations, etc.

6. It can complete the development method, support thickness, biogas concentration, support method, freezing depth, inclined shaft inclination angle and length, excavation support section, vehicle waste removal, track waste removal, altitude, contracting method, gas concentration, Coefficient adjustment for coal and rock category work;

4. Projects that can be completed:

Ground construction engineering, shaft sinking equipment, facility installation, mining equipment, facility installation, mine hoisting equipment, facility installation, shaft shaft equipment engineering, mining metal derrick installation, mine ventilation equipment, facility installation, coal mine air pressure equipment, facility installation, mine Industrial pump installation, underground industrial pipeline installation Installation, installation of coal mine hoisting and conveying equipment, facilities and lifting appliances, installation of aerial coal conveying ropeways, installation of wellheads (bottoms), coal storage yards, gangue mountains and machine repair equipment, installation of coal selection (washing) equipment and facilities, coal washing process pipelines Installation, coal mine power transformation and distribution, control equipment and signal, communication, power storage device installation , Motor installation, wiring inspection, drying and electric locomotive assembly and contact wire network erection, coal mine cable (line) laying and industrial lighting equipment installation, lightning protection device installation and electrical (appliance) adjustment test, overhead transmission line engineering, automatic control instruments and safety detection devices, transportation, anti-corrosion, oil injection, grouting, coal industry Non-standard equipment (pieces) processing product pricing quota, coal mechanical and electrical installation engineering auxiliary cost quota, vertical shaft shaft, inclined shaft shaft, inclined tunnel, adit and level tunnel, tunnel, track laying, grouting, others, level tunnel and inclined tunnel Mechanized excavation, production of finished and semi-finished products, freezing project, drilling project, ground pre-grouting project.

5. Quota issuing unit: China Coal Construction Association

Software development unit: Beijing Construction Software Company

Publisher: Tsinghua Tongfang CD Electronic Publishing House

FAQ

Zhuye Coal Construction Project Budget List Software

Zhuye coal construction project budget list software 2017 version

closure