"Construction Engineering Bill of Quantities Valuation Specification GB50500-2008".
Tibet building decoration project quota (2006).
Tibet Installation Project Quota (2006).
Tibet Municipal Engineering Quota (2006).
Tibet Garden Project Quota (2006).
Tibet civil construction and decoration project quotas (2001).
Tibet Installation Project Quota (2001).
Tibet Municipal Engineering Quota (2001).
2. Projects that can be completed:
Construction engineering: earth and stone engineering, pile foundation engineering, masonry engineering, concrete and reinforced concrete engineering, component transportation and installation engineering, door, window and wooden structure engineering, floor engineering, roofing and waterproofing engineering, anti-corrosion, heat preservation, and heat insulation Engineering, civil (decoration) engineering, metal structure fabrication engineering.
Decoration and renovation projects: floor and floor projects, wall and column projects, ceiling projects, door and window projects, paint, coating, and pasting projects.
Installation engineering: mechanical equipment installation engineering, electrical equipment installation engineering, static equipment and process metal structure fabrication and installation, industrial pipeline engineering, fire protection and safety equipment installation engineering, industrial and civil boiler installation engineering, water supply and drainage, heating, and gas engineering, Ventilation and air-conditioning projects, installation and adjustment of automatic control devices and instruments, oil painting, anti-corrosion and thermal insulation projects.
Municipal engineering: road engineering, bridge and culvert engineering, tunnel engineering, water supply engineering, drainage engineering, gas and central heating engineering, street lighting engineering.
Garden engineering: stone processing, stone installation, bark, bamboo and other plastics, garden pavement, plastic rockery, public greening, garden greening, plant relocation, felling, transportation, greening survival and maintenance.
3. Functional features:
1. The most advanced tree operation method and simple query database maintenance function.
2. Budget reports can be exported to Excel and Excel bidding files can be imported to automatically generate various report formats.
3. Rebar templates and main material equipment are automatically brought out, with powerful conversion functions.
4. Simple supplementary quota entry and intuitive quota modification function.
5. Complete the project quantity budget quotation and preparation of bidding documents based on the bidding documents provided by Party A.
4. Some customers:
Zhongkai Mineral Processing Co., Ltd., Mangkang County, Qamdo Region, Tibet Autonomous Region, Project Department of Industrial and Commercial Bureau of Chaya County, Qamdo Region, Tibet, Lhasa Jinri Heating Engineering Co., Ltd., Fannie Mae Advertising Company, Lhasa Qingda Construction Engineering Co., Ltd., Qamdo Region, Tibet Autonomous Region Mangkang County, Mangkang County Education Bureau, Qamdo Prefecture, Tibet, etc.
5. Quota issuing unit: Department of Housing and Urban-Rural Development of Tibet Autonomous Region.
Software development unit: Beijing Construction Software.
Publisher: Tsinghua Tongfang CD Electronic Publishing House.
6. Quotation: 1980 yuan for the whole warehouse and 880 yuan for a single warehouse.
it works
it works
it works