If you are looking for software to use, go to Huajun Software Park! software release

Hello, if there is a need for software inclusion, please package the software and attach the software name, software introduction, software-related screenshots, software icon, soft copy, and business license (if you do not have a business license, please provide the front and back of the corresponding developer ID card) and a photo of yourself holding your ID card) and send it to your email http://softwaredownload4.com/sbdm/user/login

Close >>

Send to email:news@onlinedown.net

Close >>

Location: front pageTable sampleSample templateMarketing Construction project feasibility study report
Construction project feasibility study report

Construction project feasibility study report free version

QR code
  • Software licensing: shareware
  • Software size: 0.07MB
  • Software rating:
  • Software type: Domestic software
  • Update time: 2024-10-31
  • Application platform: winall
  • Software language: Simplified Chinese
  • Version: Free version

Software introduction Related topics FAQ Download address

Basic introduction
Construction project feasibility study report paragraph first LOGO
Construction project feasibility study reportIt is an important document that the project implementation entity needs to entrust a professional research institution to compile in order to implement a certain economic activity. The construction project feasibility study report is provided for download by Huajun Software Park. The source file is in docx format, and users can edit and modify the content by themselves. For more information about the construction project feasibility study report download, please pay attention to Huajun Software Park.

Screenshot of construction project feasibility study report

Basic framework of construction project feasibility study report

Part 1 Project Overview

Part 2 Project construction background, necessity and feasibility

Part Three Project Product Market Analysis

Part 4 Project Product Planning Plan

Part Five Project Construction Site and Civil Construction Master Plan

Part Six Project Environmental Protection, Energy Saving and Labor Safety Plan

Part 7 Project Organization and Labor Capacity

Part 8 Project Implementation Schedule

Part 9 Project Financial Evaluation Analysis

Part 10 Evaluation of Project Financial Benefits, Economic and Social Benefits

Part 11 Project Risk Analysis and Risk Prevention and Control

Part 12 Project Feasibility Study Conclusions and Suggestions

Construction project feasibility study report meets the requirements

1. Water level information collection instruments and equipment: mainly include the determination and selection of performance indicators and equipment such as ultrasonic water level gauges, radar water level gauges, bubble water level gauges, pressure water level gauges, float water level gauges, and electronic water gauges.

2. Flow and sediment information collection instruments and equipment: mainly including hydrological test cableway equipment (hydrological winch, test control system, hanging box, lead fish, buoy thrower, etc.), bridge testing vehicle, flow and sediment information collection, processing and analysis Determination and selection of performance indicators of instruments and lightning protection grounding equipment.

3. Precipitation, evaporation and other meteorological information collection and processing instruments and equipment: mainly include the determination and selection of performance indicators of instruments and equipment such as evaporation dishes, evaporators, telemetry evaporators, rain gauges, rain gauges, rain (snow) amount telemetry collection systems, etc.

​ 4. Water quality monitoring and analysis instruments and equipment: It mainly includes the determination and selection of performance indicators of water quality monitoring and analysis instruments and equipment, water quality automatic monitoring station instruments and equipment, mobile laboratories and other instruments and equipment.

5. Real-time hydrological image monitoring equipment: mainly includes the determination and selection of performance indicators of instruments and equipment such as video capture unit equipment, video signal transmission unit equipment, video encoding unit equipment, and PTZ control.

The editor recommends:

The construction project feasibility study report is a free template. You can download the source file for you to edit, modify and replace. Huajun Software Park also providesTourism market research report sample,Tourism market research reportdownload.

FAQ

Construction project feasibility study report

Construction project feasibility study report free version

closure