If you are looking for software to use, go to Huajun Software Park! software release

Hello, if there is a need for software inclusion, please package the software and attach the software name, software introduction, software-related screenshots, software icon, soft copy, and business license (if you do not have a business license, please provide the front and back of the corresponding developer ID card) and a photo of yourself holding your ID card) and send it to your email http://softwaredownload4.com/sbdm/user/login

Close >>

Send to email:news@onlinedown.net

Close >>

Location: front pageTable sampleSample templateMarketing Project results report
Project results report

Project Achievements Report Free Version

QR code
  • Software licensing: shareware
  • Software size: 0.07MB
  • Software rating:
  • Software type: Domestic software
  • Update time: 2024-10-31
  • Application platform: winall
  • Software language: Simplified Chinese
  • Version: Free version

Software introduction Related topics FAQ Download address

Basic introduction
Logo at the beginning of the project results report paragraph
Project results reportIt is a result report document written by scientific and technological workers who have achieved substantial results in the scientific research projects they have undertaken. The free download of the project results report is provided by Huajun Software Park. The source file is in xlsx format. You can edit and modify the content style by downloading the source file. For more free downloads of project results reports, please pay attention to Huajun Software Park.

Screenshot of project results report

Basic introduction to project results report

1. In order to standardize the preparation and review of geological survey project performance reports (hereinafter referred to as "results statements") and ensure the quality of geological survey project performance reports, these requirements are specially formulated in accordance with relevant standards and requirements.

2. This requirement applies to the preparation and review of performance reports for geological survey projects (including planned projects and operational projects) organized and implemented by the Geological Survey Bureau.

3. Performance reports are divided into three categories according to the nature of the project: one is the geological inquiry and evaluation report (including regional geology, mineral geology, regional geophysics, regional geochemistry, hydrogeology, engineering geology, environmental geology, remote sensing geology, etc.); The first is technical method reports (including geophysical prospecting, geochemical prospecting, drilling technology, remote sensing, experimental tests, information technology, etc.); the third is research reports (including basic research, strategic research, planning preparation, standard formulation, management system formulation, database construction, pre-study of major projects, etc.).

Project results report shortcut keys

Ctrl+Shift+Spacebar: Create non-breaking spaces

Ctrl+Hyphen: Create a non-breaking hyphen

Ctrl+B: Bold letters

Ctrl+I: Make letters slant

Ctrl+U: Underline characters

Ctrl+[: Reduce font size by 1 point

Ctrl+]: Increase the font size by 1 point

Ctrl+Spacebar: Delete paragraph or character format

Ctrl+C: Copy selected text or object

Ctrl+X: Cut selected text or objects

Ctrl+V: Paste text or object

Ctrl+Alt+V: Paste Special

Ctrl+Shift+<: Reduce the font size by one value

Ctrl+Shift+>: Increase the font size by one value

The editor recommends:

The project results report is a free template. You can download the source file for you to edit, modify and replace. Huajun Software Park also providesProject mid-term inspection report,Project Funding Application Reportdownload.

FAQ

Project results report

Project Outcome Report Free Edition

closure