The format and basic structure of the work plan
1. Title. The title of the plan can be divided into two types: full form and concise form, and the full form is the most common. The full form is composed of the three elements of unit, subject and language; the condensed form is composed of the two elements of subject and language.
2. Sign and sign. The plan does not need to indicate the time in the title, nor does it always put the generation time at the end of the article. Instead, it is mostly listed in a specific position below the title and above the main text.
3. Text part. Most work plans consist of an introduction or quotation and basic content.
Format and main matters of the work plan
1. Determining goals is an important part of formulating work plans, and the two scientific methods of survey research and forecasting technology should be organically combined
2. In the process of formulating the work plan, we must rely on think tanks and use think tank technology, and use a variety of methods to try to avoid possible problems, so as to make the plan more complete.
3. When drafting various alternative work plans, it is necessary to extensively collect various materials and theoretical policy basis, conduct qualitative and quantitative, point-to-face analysis, conduct feasibility studies, and put forward suggestions. Or by analyzing, comparing, identifying, and evaluating various drafts, on the basis of multiple plans, we can gather the wisdom of everyone to recombine a new work plan as the best plan for leadership to make a decision.