Basic introduction to project implementation summary report
Project implementation refers to a series of work from project survey and design, construction preparation, planning and arrangement, engineering construction, production preparation, completion acceptance, until the project is completed and put into production. It is the substantive stage of project construction. During the project implementation stage, the construction unit must establish a management organization to preside over the bidding and evaluation of project design and construction, sign design contracts, construction contracts, and material and equipment procurement contracts, formulate project implementation plans, connect and coordinate all aspects of work, recruit and Train workers, prepare for production, and conduct trial operations. The design unit must complete the designed parts on time, the construction unit must complete the construction and installation tasks on time, ensure that the project is completed and put into production, and the lending bank must allocate funds in a timely manner and supervise the implementation of the project.
Basic contents of project implementation summary report
(1) Management of project implementation
Establish corresponding preparatory organizations, handle project survey, design, construction bidding and entrustment procedures, participate in plant site selection (new plant), provide necessary basic information, apply for or order equipment and materials, be responsible for equipment inspection and transportation, and undertake various production tasks Preparation. Carrying out these tasks requires corresponding time and funds.
(2) Design and equipment ordering
Design is generally divided into two stages: preliminary design and construction drawing design, and corresponding basic information must be prepared. Contact ordering and manufacturing (including inquiry, quotation, negotiation, etc.) according to the equipment list, and master the manufacturing cycle, arrival time and cooperation with the installation project.
(3) Raising project funds
.
(4)Construction stage
(1) Purchase of land, including crop compensation, relocation, personnel arrangements, etc.
(2) Supervise and coordinate civil construction and equipment acceptance and installation, commissioning and trial production.
(3) Recruitment and training of personnel.
(4) Material supply.
(5) Planning and arrangement of product marketing work.