Hello, if there is a need for software inclusion, please package the software and attach the software name, software introduction, software-related screenshots, software icon, soft copy, and business license (if you do not have a business license, please provide the front and back of the corresponding developer ID card) and a photo of yourself holding your ID card) and send it to your email http://softwaredownload4.com/sbdm/user/login

Close >>

Send to email:news@onlinedown.net

Close >>

Location: front pageTable sampleform templateSchedule management Material arrival schedule
Material arrival schedule

Material arrival schedule free version

QR code
  • Software licensing: shareware
  • Software size: 0.01MB
  • Software rating:
  • Software type: Domestic software
  • Update time: 2024-10-31
  • Application platform: WinAll
  • Software language: Simplified Chinese
  • Version: Free version

Download the service agreement at the bottom of the page

Software introduction Related topics FAQ Download address

Basic introduction
Material arrival plan section first LOGO
Material arrival scheduleBe responsible for the quality of incoming materials, provide tracking services, and master the use of materials. The free download Excel template of the Material Arrival Plan is provided by Huajun Software Park. The source file is in xlsx format. You can edit and modify the content style by downloading the source file. For more free downloads of the Material Arrival Plan download template, please pay attention to Huajun Software garden. Screenshot of material arrival schedule Tips for using material arrival schedule

​​​Material arrival scheduledetailedHow to fill in?
①、Material supply. Cooperate with the designer to determine the brand, material, and specifications of the required materials, carefully calculate the quantity of required materials, and organize material suppliers to supply them.
​ ​ ②. Material procurement. When faced with a wide range of material purchase orders, the quantity, brand, specification, origin, etc. must be clearly marked one by one. The size, material, template, etc. must be in place at once to avoid inconsistencies in material ordering, which will affect the progress of the project.
③. Materials are classified and stacked. According to the actual site conditions and progress, we will reasonably arrange for the materials to enter the site, conduct on-site acceptance of the materials, conduct random inspections and samples, and report them to Party A and the design unit for inspection.
④. Material distribution. Use tracking and verification. For materials arriving on site, they must be inspected and registered, and they must be issued and used strictly according to the construction progress according to the material release form. The issued materials must be tracked to avoid loss or waste of materials.

General Tips for Material Arrival Plan Form 1: Quick sum and average
If you want to directly know the sum or average of certain numbers, just select those numbers to find out. After selection, summation, average, and count will be displayed in the bottom status bar.
​ ​ 2: Format brush
The use of Format Painter is very simple. Just click on Format Painter, then select the format you want to copy, and finally select the cells you want to modify. You can modify it in batches.
​ ​ 3: Quick copy and paste
​​Select one or some data, and then move the cursor to the lower right corner of the selection box. When the cursor turns into a plus sign, drag it downwards, and it will intelligently fill in 1, 2, 3... for you.
4: Automatic line wrapping
After typing the text in the cell, find the "Automatically wrap" button on the toolbar and you can freely switch the text between wrapping and not wrapping.
Recommended by the editor of Huajun Software Park

Material arrival scheduleIt is a very practical form, and most of the forms to be filled in are for general purposes. If you happen to need to download the material entry plan, please download it quickly. also,Student information registration form,Securities business statistics tableIt is also a good software. Welcome to click to download and experience it!