If you are looking for software to use, go to Huajun Software Park! software release

Hello, if there is a need for software inclusion, please package the software and attach the software name, software introduction, software-related screenshots, software icon, soft copy, and business license (if you do not have a business license, please provide the front and back of the corresponding developer ID card) and a photo of yourself holding your ID card) and send it to your email http://softwaredownload4.com/sbdm/user/login

Close >>

Send to email:news@onlinedown.net

Close >>

Location: front pageTable sampleform templateSchedule management Material schedule
Material schedule

Material schedule free version

QR code
  • Software licensing: shareware
  • Software size: 0.01MB
  • Software rating:
  • Software type: Domestic software
  • Update time: 2024-10-31
  • Application platform: WinAll
  • Software language: Simplified Chinese
  • Version: Free version

Download the service agreement at the bottom of the page

Software introduction Related topics FAQ Download address

Basic introduction
Material plan section first LOGO
Material scheduleyesStatistics of material usage and better planning of materials use and preparation of tables.The free download of material plan download Excel template is provided by Huajun Software Park. The source file is in xlsx format. You can edit and modify the content style by downloading the source file. For more free download of material plan download template, please pay attention to Huajun Software Park. Screenshot of material plan Tips for using materials schedule

​​​Material planningHow to compile the table:
​ ​ 1. Material planning is a control plan for materials and is the basis for external procurement and ordering, so special attention must be paid to balance.
​​ 2. The material plan is prepared based on the signed project contract and annual construction plan, with reference to the project structure and construction period requirements, and based on the budget quota or estimated budget quota.
​​ 3. The requirement for material planning is to have strong predictability, specifications, varieties, and quality must be determined and implemented. Generally, changes should not be made after ordering.

General Tips for Material Plan Forms 1: IF function conditional judgment
The IF function is one of the most commonly used judgment functions, which can complete either-or judgments.
The assessment score standard is 9 points. It is necessary to judge whether the assessment results in column B are qualified.
=IF(B4>=9,"qualified","unqualified")
​ ​ 2: Multi-condition judgment
If the department is production and the position is mainly for operations, there is a high temperature subsidy. Use the formula in column D:
=IF(AND(B2="Production",C2="Main Operator"),"Yes","No")
Recommended by the editor of Huajun Software Park

Material scheduleIt is a very practical form, and most of the forms you fill in are for general purposes. If you happen to need to download the material plan, please download it quickly. also,Short term investment schedule,Graduate School Leaving Procedure CardIt is also a good software. Welcome to click to download and experience it!

FAQ

Material schedule

Material Schedule Free Edition

closure