Engineering construction management work report writing skills
(1) Beginning: Summarize the main purpose of the text, get straight to the point, and name it. Summarize the overall situation of all aspects of work within a certain period of time, such as basis, purpose, estimation and evaluation of the entire work, to clarify the main purpose.
(2) Main body: The content should be rich and substantial. As the core of the text, the main situation of the work, main methods, experience gained, effects, etc. are expressed in paragraphs. Data and materials should be used to speak, and the content should be both detailed and summarized.
(3) Ending: Be specific and practical. Write down existing problems at work and put forward specific suggestions for next steps.
Basic contents of project construction management work report
(1) Overview
(2) Construction organization and implementation plan
1. Construction organization structure and project site management personnel.
(1) Project construction organization structure;
(2) Project construction site management personnel.
Project Manager: Deputy Project Manager:
Technical person in charge: Construction worker: