Factory construction and cooperation agreement template
Factory Construction and Cooperation Agreement Sample Factory Construction Contract Issuer: (hereinafter referred to as Party A) Contractor: (hereinafter referred to as Party B) Based on the principle that both parties have consistent interests and each assumes their own responsibilities, and in accordance with the "Contract Law" and through mutual negotiation between Party A and Party B, the following house construction contract is specially drawn up: Party A will build a factory building located next to the highway (), which will be constructed by Party B on a contract basis, divided into two parts. The building area is calculated based on the actual area that has passed the project completion acceptance. Party B must carry out construction according to Party A's requirements to ensure project quality requirements. Party A is responsible for 5,000 yuan for the dustpan, nails, and iron wire, and Party B is responsible for the remainder. Party B is responsible for all other necessary tools (including templates, tools, vibration pumps, mixers, lifts, welders, vibration plates, jumping rods, safety nets and other construction tools, etc.).
it works
Useful
Useful