o(╥﹏╥)oSad

WeChat cannot downloadConstruction project feasibility study report, but just click on the upper right corner and select open in browser or Safari!
Construction project feasibility study report

Construction project feasibility study report

  • Size: 0.07M
  • Language: Simplified Chinese
  • Category: Marketing
  • System: winall

Construction project feasibility study reportIt is a written report text that studies and analyzes the possibility and feasibility of the construction conditions before determining the construction project. The feasibility study report of a construction project is of decisive significance and can provide scientific basis for investment decisions. The free version of the construction project feasibility study report is provided by Huajun Software Park for you to download. The source file is in docx format. Users can edit and modify the content by themselves.

Basic format of feasibility study report for construction projects

(1) Basic situation

(2) Product production arrangements and their basis. It is necessary to explain the domestic and foreign market demand and market forecasts, as well as the existing and under-construction production equipment capabilities at home and abroad.

(3) Material supply arrangements (including energy and transportation) and their basis.

(4) Project address selection and its basis.

(5) Selection of technical equipment and technological processes and their basis (including arrangements for batch delivery of domestic and foreign equipment).

(6) Production organization arrangements (including the total number of employees, composition, sources and operation and management) and their basis.

(7) Environmental pollution control, labor safety protection, sanitation facilities and their basis.

(8) Construction methods, construction schedule arrangements and their basis.

(9) Fund raising and its basis (including basis for calculation of shares in factories and equipment).

(10) Foreign exchange receipts and payments arrangements and their basis.

(11) Comprehensive analysis (including economic, technical, financial and legal analysis). Methods such as dynamic method and risk method (or sensitivity analysis method) should be used to analyze project benefits and foreign exchange receipts and payments.

(12) Necessary accessories.

Construction project feasibility study report shortcut keys

Alt+Ctrl+S: Split document window

Alt+Shift+C: Undo split document window

Ctrl+F: Find content, formats and special items

Alt+Ctrl+Y: Repeat search

Ctrl+H: Replace text, specific formats and special items

Ctrl+G: Go to page, bookmark, footnote, table, comment, graphic or other location

Alt+Ctrl+Z: Switch between the last four edited positions

The editor recommends:

The construction project feasibility study report is a free template. You can download the source file for you to edit, modify and replace. Huajun Software Park also providesConstruction project environmental impact report form,Project feasibility study report templateDownload.

Version: Free version | Update time: 2024-10-31

Similar recommendations

Latest updates

Construction Project Feasibility Study Report Comments

  • 1st floor Huajun netizen 2022-02-22 05:35:40
    A very practical construction project feasibility study report, just the template I need
  • 2nd floor Huajun netizen 2022-03-19 18:50:22
    It’s not easy to find a free construction project feasibility study report template
  • 3rd floor Huajun netizen 2021-11-24 23:36:24
    Construction project feasibility study report free download, good experience

Recommended products

everyonealso likeThese:

+

This application has not passed real-name authentication. You can download it through the mobile assistant.

CancelOK