Introduction to the functions of Pinming network planning software
1. The software automatically establishes the immediate relationship and generates the critical path, and you can draw by dragging the mouse.
2. Time-scale logical network diagrams, time-scale network diagrams, and horizontal line diagrams are automatically converted without repeated drawing.
3. It can also prepare all work progress schedules, and can draw various types of work such as real work, virtual work, auxiliary work, pending work, milestones, etc.
4. The resource map drawing function can reasonably allocate resources in real time according to the project progress.
5. Rich forward line control, free time adjustment, resource control and other functions ensure project progress control and management.
6. Free partitions, horizontal and vertical partitions can be set at will.
7. Various legends are provided and can be maintained using subnetworks.
8. Rich customization functions, customize line thickness, color, and annotation text.
Features of Pinming network planning software
Draw a double-code network diagram
When drawing, the software automatically establishes the immediate relationship and automatically generates key lines. The diagram can be printed in color. The network diagram can be directly converted into a horizontal line diagram after drawing. Exquisite network diagrams can effectively improve the image quality and standardization of technical targets.
Prepare progress schedule
Through this software, all work progress schedules can be prepared, and various types of work such as real work, virtual work, auxiliary work, pending work, milestones, etc. can be drawn.
Project progress control and management
The software provides forward line control, free time difference adjustment, resource control and other functions, which can realize real-time progress prediction and scheduling, thereby controlling and managing project progress.
Pinming network planning software installation method
1. Download and unzip the Pinming network planning software in Huajun Software Park, and click on the Pinming network planning software.exe.
2. The installation wizard interface will appear, click Next
3. Click I agree to this agreement and click Next
4. At this time, select the installation location. Huajun editor recommends installing on the D drive, and then click Next
5. At this time, the installation preparation interface will pop up. We click Install.
6. Pinming network planning software is being installed, waiting for the progress bar to be full.
7. The final installation is completed
Experimental method of Pinming network planning software
1. Just drag the mouse to create a new job. Through operation, the software can only identify the immediate and immediate jobs, key lines, time differences, etc.
2. Humanized holiday setting function, all kinds of holidays are clear at a glance, and you can choose whether the holidays should be included in the total construction period
3. The resource map is combined with the network map, and the daily demand for labor, steel, etc. is clearly visible, and the resource demand is perfectly combined with the construction schedule.
4. The network plan diagram and the horizontal line diagram are automatically converted, saving time and worry. Various horizontal line diagram sorting methods such as start, end, and serial numbers are provided to meet the different needs of the construction site.
5. A variety of output methods are provided to choose from, spt, jpg, wmf, etc. to meet different customer needs.
Pinming network planning software update log
1. Enhanced functions of quick-add panel
Description: 1. Add the function of job positioning
2. Add quick selection columns for immediate work and immediate work (the same applies to horizontal bar charts)
3. The quick panel adds the function of exporting Excel and word tables and importing excel tables;
2. Subnet function (add and use subnet diagram, subnet library)
3. Custom page printing function
4. Work decomposition-enhanced component functions
5. Draw diagonal lines (arrow offset) and vertical partitions
6. New items newly added to the project:
1. The minimum number of days that the network diagram can be set is 1 day.
2. Add the option to fill in the network plan and bar graph title in the project overview
7. Modify the step length (15 days -> 31 days), add text modifications during the winter break
8. Automatic prompts when the network diagram is converted to a horizontal bar diagram and the super page
9. Printing adjustment and optimization:
(1) Scale frame height
(2) Text arranged vertically
10. BUG modification: Modified the display problem of canceling when winter break exists
11. Modify the online upgrade function, add version range division and upgrade, and upload multiple attachments to the problem-through train;
12. Added encryption lock loss reporting function;
Huajun editor recommends:
Pinming network planning software is one of the best in the industry. I believe many friends will have used it. If you don’t use it anymore, you will be out. This site also prepares for youFuture list pricing,Fang Guanjia ERP real estate agency management software,Concrete mix ratio calculator,Southern total station transmission software,Aiyifang login platform