Hello, if there is a need for software inclusion, please package the software and attach the software name, software introduction, software-related screenshots, software icon, soft copy, and business license (if you do not have a business license, please provide the front and back of the corresponding developer ID card) and a photo of yourself holding your ID card) and send it to your email http://softwaredownload4.com/sbdm/user/login

Hide>>

Send to email:news@onlinedown.net

Hide>>

Location: front pageTable sampleform templateSchedule management Project implementation schedule
Project implementation schedule

Project Implementation Schedule Free Version

QR code
  • Software licensing: shareware
  • Software size: 0.01MB
  • Software rating:
  • Software type: Domestic software
  • Update time: 2024-10-31
  • Application platform: WinAll
  • Software language: Simplified Chinese
  • Version: Free version

Download the service agreement at the bottom of the page

Software introduction Related topics FAQ Download address

Basic introduction
Logo at the beginning of the project implementation schedule section
Project implementation scheduleIt refers to preparing progress and resource supply plans, controlling progress, and achieving construction deadlines on the basis of coordination with quality and cost objectives. The free download of the project implementation schedule is provided by Huajun Software Park. The source file is in xlsx format. You can edit and modify the content style by downloading the source file. For more free downloads of the project implementation schedule, please pay attention to Huajun Software Park.
Screenshot of project implementation schedule
Tips for using project implementation schedule ​​​Classification of project implementation schedule:

​​ 1. When formulating a project schedule, project scope management must be the basis and project activities must be arranged in a targeted manner according to the content requirements of the project scope.
2. Analyze the entire project structure, including the implementation process and details, and decompose the project systematically and regularly.
3. Based on the project schedule, the implementation will be continuously tracked and inspected during the implementation process, and information on the actual progress will be collected.

General tips for project implementation schedule forms

​ ​ 1: How to sum text
In some relatively non-standard tables, there will be a problem of mixing text and numbers, which makes summation difficult.
​​ Enter the formula in cell C12: =SUM(--SUBSTITUTE(C2:C11,"元",""))
              Press the key combination to complete.
​ ​ 2: Sum of multiple worksheets
For example, some tables have performance statistics for several months, and Zhang Cheng’s position in each worksheet is the same. Find Zhang Cheng’s commission statistics from a certain month to a certain month.
​ ​ Enter the formula in cell F5: =SUM('January:April'!C2), and press Enter to complete the filling.
Note: The above reference is supported in Excel, but it seems not supported in WPS. And please note that the structure or fixed position of the numbers in each table is the same before you can use this formula.
​ ​ 3: Multi-region joint calculation
In some worksheets, we do not need to sum continuous areas, but may be summing several discontinuous areas.
For example, there is a table that calculates the totals from January to February, March and May to June.
​​Enter the formula in cell H2, press the Enter key to complete and fill downwards.
=SUM(B2:C2,E2,G2)

Recommended by the editor of Huajun Software Park

The project implementation schedule is a very practical form, and most of the filling forms are for general purposes. If you happen to need to download the project implementation schedule, download it quickly.Intended customer registration form,Recruitment interview registration formIt is also a good software. Welcome to click to download and experience it!

FAQ