Hello, if there is a need for software inclusion, please package the software and attach the software name, software introduction, software-related screenshots, software icon, soft copy, and business license (if you do not have a business license, please provide the front and back of the corresponding developer ID card) and a photo of yourself holding your ID card) and send it to your email http://softwaredownload4.com/sbdm/user/login

Close >>

Send to email:news@onlinedown.net

Close >>

Location: front pageTable sampleform templateSchedule management Construction schedule
Construction schedule

Construction schedule free version

QR code
  • Software licensing: shareware
  • Software size: 0.01MB
  • Software rating:
  • Software type: Domestic software
  • Update time: 2024-10-31
  • Application platform: WinAll
  • Software language: Simplified Chinese
  • Version: Free version

Download the service agreement at the bottom of the page

Software introduction Related topics FAQ Download address

Basic introduction
Construction period schedule section first LOGO
Construction scheduleIt refers to the time period within which work is carried out in a planned manner to complete a project. The free download of the construction schedule is provided by Huajun Software Park. The source file is in xlsx format. You can edit and modify the content style by downloading the source file. For more free downloads of the construction schedule, please pay attention to Huajun Software Park.
Screenshot of construction schedule
Tips for using construction schedule ​​​Classification of construction schedule:

①The period from the start of construction to completion is calculated based on all calendar days, without deducting the number of downtime days, and is called the "calendar construction period".
② Deduct the number of days without construction during holidays and the number of days when work is stopped due to design, materials, climate and other reasons from all calendar days, which is called the "actual construction period".

General tips for construction schedule forms

1. Modify the font
First, let’s start with input and adjust the font. You can find the font tool box at the beginning of the toolbar, where you can quickly change the font type, size, color, etc.
2. Insert and delete cells
In the cell tool box, you can quickly insert or delete cells with one click. For example, sometimes when typing, a row of data is missed. Here, click "Insert Row" in "Insert Cell" under "Rows and Columns" and it will be OK.
​ ​ 3: Hide the chapter list
​​Select the first line, hold down [shift+F] to open the "Find and Replace" dialog box, "Remarks to find all, hold down shift+A to select all, then close the dialog box, hold down [ctri+0] to hide
​ ​ 4: Quickly select specific columns
​​Select the table area, click the "Create from selected content" dialog box under the [Formula] tab, select "First Row", after the settings are completed, open the name box in the upper left corner, click the corresponding list to jump to the specified column.
​​Two column name verification
If you want to check whether the name in Table 2 appears in Table 1, a formula can be used to do it immediately.
=IF(COUNTIF(A:A,C2),"Yes","No")

Recommended by the editor of Huajun Software Park

The construction schedule is a very practical form, and most of the forms you fill in are for general purposes. If you happen to need to download the construction schedule, download it quickly.Member profile management form,Student file detailsIt is also a good software. Welcome to click to download and experience it!