If you are looking for software to use, go to Huajun Software Park! software release

Hello, if there is a need for software inclusion, please package the software and attach the software name, software introduction, software-related screenshots, software icon, soft copy, and business license (if you do not have a business license, please provide the front and back of the corresponding developer ID card) and a photo of yourself holding your ID card) and send it to your email http://softwaredownload4.com/sbdm/user/login

Hide>>

Send to email:news@onlinedown.net

Hide>>

Location: front pageTable sampleform templateSchedule management Design project schedule
Design project schedule

Design project schedule free version

QR code
  • Software licensing: shareware
  • Software size: 0.01MB
  • Software rating:
  • Software type: Domestic software
  • Update time: 2024-10-31
  • Application platform: WinAll
  • Software language: Simplified Chinese
  • Version: Free version

Download the service agreement at the bottom of the page

Software introduction Related topics FAQ Download address

Basic introduction
Design project schedule section first LOGO
Design project scheduleIncludes the planned start date and expected completion date for each specific activity. The free download of the design project schedule is provided by Huajun Software Park. The source file is in xlsx format. You can edit and modify the content style by downloading the source file. For more free downloads of the design project schedule, please pay attention to Huajun Software Park.
Screenshot of design project schedule
Tips for using design project schedule ​​​Classification of design project schedule:

1. Determine the goals, nature and tasks of the schedule.
2. Carry out work decomposition.
3. Collect the basis for preparation.
4. Determine the start and end time and milestones of the work.
5. Deal with the logical relationship between various tasks.
6. Prepare schedule.

General Tips for Designing Project Schedule Forms

​ ​ 1: IF function conditional judgment
The IF function is one of the most commonly used judgment functions, which can complete either-or judgments.
The assessment score standard is 9 points. It is necessary to judge whether the assessment results in column B are qualified.
=IF(B4>=9,"qualified","unqualified")
​ ​ 2: Multi-condition judgment
If the department is production and the position is mainly for operations, there is a high temperature subsidy. Use the formula in column D:
=IF(AND(B2="Production",C2="Main Operator"),"Yes","No")
3: Conditional summation
Use the SUMIF function to calculate the total score of a class:
=SUMIF(D2:D5,F2,C2:C5)
​ ​ 4: SUMIF usage is:
=SUMIF(condition area, specified summation condition, summation area)
In layman’s terms, it can be described as:
If the class in the D2:D5 area is equal to the "first class" of the F2 cell, sum the corresponding area of ​​the C2:C5 cell.

Recommended by the editor of Huajun Software Park

The design project schedule is a very practical form, and most of the forms you fill in are for general purposes. If you happen to need to download the design project schedule, download it quickly.Household Income Accounting Sheet,Street stall income and expenditure accounting tableIt is also a good software. Welcome to click to download and experience it!

FAQ

Design project schedule

Design Project Schedule Free Edition

closure