1. It is a basic document for construction preparation for the upcoming decoration project. It determines economic and reasonable arrangements based on the requirements of the decoration project construction project.
2. There are two representation methods: horizontal bar graph and grid graph.
3. To manage decoration construction, a set of formal construction procedures must be implemented for supervision.
1. Sum: =SUM(K2:K56) Sum the area from K2 to K56;
2. Average: =AVERAGE(K2:K56) Find the average of the area K2 K56;
3. Ranking: =RANK(K2,K$2:KS56) ranks the results of 55 students;
4. Level: =IF(K2>=85, "Excellent", IF(K2>=74, "People", IF(K2>=60, "Pass", "Fail")))
5. Semester overall evaluation: =K2*0.3+M2*0.3+N2*0.4 Assume that column K, column M and column N respectively store the three grades of students: "usual overall evaluation", "midterm" and "final";
6. Highest score: =MAX(K2:K56) Find the highest score in the K2 to K56 area (55 students);
7. Minimum score: =MIN(K2:K56) ——- Find the lowest score in the K2 to K56 area (55 students);
The decoration construction schedule is a very practical form, and most of the forms are for general purposes. If you happen to need to download the decoration construction schedule, please download it quickly.Asset impairment provision details,Summary table of asset evaluation resultsIt is also a good software. Welcome to click to download and experience it!