Hazardous waste management system acceptance scope
1. Incineration of more than 10,000 tons of hazardous waste per year;
2. Disposal of hazardous waste containing polychlorinated biphenyls, mercury and other hazardous wastes that pose a great threat to the environment and human health;
3. Use comprehensive centralized disposal facilities listed in the national hazardous waste disposal facility construction plan to dispose of hazardous waste.
Hazardous waste management system content
1. The production technology department should actively improve the production technology and production management to minimize the generation of hazardous waste.
2. The process team leader and unit staff where hazardous waste occurs are responsible for the initial collection and daily management of hazardous waste, handle any abnormalities in a timely manner, and report in a timely manner.
2. The directors of each unit are responsible for the hazardous wastes in their units and resolutely eliminate the phenomenon of running, leaking, dripping and leaking.
3. Hazardous waste collection devices in production areas should have eye-catching warning signs.
2. Transportation of hazardous waste
1. Each factory should immediately submit an application to the Department of Safety and Environmental Protection for processing hazardous waste to reach the critical value for factory storage.
2. Transportation can only be carried out after approval from the Safety and Environmental Protection Department and some management leaders.
3. The person in charge, special vehicle transportation, and on-site statistics and transportation of hazardous waste.
4. Hazardous waste storage sites should comply with national standards and have eye-catching warning signs.
The editor recommends:
The hazardous waste management system is a free template. You can download the source file for you to edit, modify and replace. Huajun Software Park also provides20 Employee Management Systems,Hazardous work management systemdownload.
it works
it works
it works