Decoration budgetItems:
1. Civil construction renovation: build wire troughs, bottom boxes and wall demolition according to the plan
2. Concealed water and electricity projects: Separate the strong and weak electricity into separate pipes and slots, and then use steel wires to thread them.
3. Mud work: After the waterproofing is completed, conduct a 48-hour water shut-off test, paving kitchen and bathroom wall and floor tiles, floor leveling, and concealing wire pipes
4. Woodworking engineering: partial ceiling, styling treatment, cabinet production
5. Painting project: level the putty three times, sand it with sandpaper, apply primer once, apply topcoat twice, and polish again
6. Installation project: installation of lamps, sanitary ware, switches, panels, and hardware pendants
7. Cleaning: After the land reclamation and cleaning is completed, the owner will be notified for acceptance.
2. Average: =AVERAGE(K2:K56) Find the average of the area K2 K56;
3. Ranking: =RANK(K2,K$2:KS56) ranks the results of 55 students;
4. Level: =IF(K2>=85, "Excellent", IF(K2>=74, "People", IF(K2>=60, "Pass", "Fail")))
5. Semester overall evaluation: =K2*0.3+M2*0.3+N2*0.4 Assume that column K, column M and column N respectively store the three grades of students: "usual overall evaluation", "midterm" and "final";
6. Highest score: =MAX(K2:K56) Find the highest score in the K2 to K56 area (55 students);
7. Minimum score: =MIN(K2:K56) ——- Find the lowest score in the K2 to K56 area (55 students);
Recommended by the editor of Huajun Software Park
Decoration Budget SheetIt is a very practical form, and most of the forms you fill in are for general purposes. If you happen to need a decoration budget form, download it quickly. also,Class assessment summary table,Class statistics tableIt is also a good software. Welcome to click to download and experience it!
it works
it works
it works