Fill in the content of the schedule template:
1. Generally, it must include the name, number, date of preparation, preparation department or preparer, reviewer, approver, etc.
2. Each company’s forms have its own fixed format, and the forms between various departments of the company are closely related in both content and form.
3. When designing a specific work plan form, you must consider the interface with other forms and coordinate with other forms to form a comprehensive, systematic work plan form structure that can meet the requirements of enterprise management.
In some relatively non-standard tables, there will be a problem of mixing text and numbers, which makes summation difficult.
Enter the formula in cell C12: =SUM(--SUBSTITUTE(C2:C11,"元",""))
Press the key combination to complete.
2: Sum of multiple worksheets
For example, some tables have performance statistics for several months, and Zhang Cheng’s position in each worksheet is the same. Find Zhang Cheng’s commission statistics from a certain month to a certain month.
Enter the formula in cell F5: =SUM('January:April'!C2), and press Enter to complete the filling.
Note: The above reference is supported in Excel, but it seems not supported in WPS. And please note that the structure or fixed position of the numbers in each table is the same before you can use this formula.
3: Multi-region joint calculation
In some worksheets, we do not need to sum continuous areas, but may be summing several discontinuous areas.
For example, there is a table that calculates the totals from January to February, March and May to June.
Enter the formula in cell H2, press the Enter key to complete and fill downwards.
=SUM(B2:C2,E2,G2)
Recommended by the editor of Huajun Software Park
Schedule templateIt is a very practical form, and most of the forms you fill in are for general purposes. If you happen to need to download a planner template, please download it quickly. also,Supplementary indicator table for construction companies,Annual report on main statistical indicators of new production capacityIt is also a good software. Welcome to click to download and experience it!