Yili Construction Progress Network Planning/Project Management Software 2016 Free Trial Version

Yili Construction Progress Network Planning/Project Management Software 2016 Free Trial Version

The project management software has also launched a stand-alone official version, with nationwide cash on delivery. You can log in to the official website. Latest update: 20150922

1. Rich charts:

Provides horizontal line diagrams, outline diagrams, single-code network diagrams, dual-code time scale network diagrams (equidistant time scales), dual-code logical time scale networks (unequal intervals), double-code logical network diagrams (no time scale), and resource curves Diagram (can be displayed on the same screen as the dual-code network diagram) and statistical reports of various tasks, resources, and resource allocation, allowing you to easily cope with various projects. Second Processing Intelligence:

The software automatically calculates the number of nodes in the network, key lines, time differences and forward lines. After resource allocation, it automatically calculates costs and generates corresponding reports. Data sharing and synchronization between double code numbers, single code numbers, and horizontal bar graphs is completed instantly.

3. Easy to operate:

Adding, inserting, deleting, copying, pasting, moving, editing and modifying tasks, and zooming in and out of views can all be easily completed in one or two mouse clicks or drags. The operation is responsive and fast, and supports unlimited "undo" and "Restore" function. You can easily create beautiful network diagrams by knowing the task names and relationships.

Four resources are effective:

It can conveniently maintain resources, allocate task resources and draw resource curves. It provides two ways to draw resource diagrams: task allocation resources and manual drawing, and task costs are automatically calculated.

Five graphics elements are diverse:

You can use the drawing toolbar to insert basic graphics such as lines, circles, rectangles, and multi-line text into any network diagram to supplement the network diagram. You can even insert Ole objects such as Word documents and Excel spreadsheets.

6. Diverse interfaces:

The data can be directly read from Microsoft Project and Menglong project files, and can be output to AUTOCAD, WORD, PROJECT and other software for further processing to meet the user's personalized requirements.

Supports bitmap output, clipboard output, web page output, text file output, and reports can directly generate Web pages.

7. Convenient tracking:

Conveniently decompose tasks, establish a complete outline task structure and sub-network, and realize hierarchical control and management of project plans. Provides dynamic tracking tools such as progress rulers and actual progress front lines. Each task provides a comparison of the baseline plan and 10 mid-term plans to save the intermediate state time. The selected mid-term and baseline plans can be displayed simultaneously on the horizontal bar chart to facilitate the completion of the project. and comparison of modifications.

8. Convenient and practical:

It provides practical functions such as Chinese and English selection, legend display, note content and location settings, on-site editing, dual code area segmentation display, network diagram interface scheme selection, automatic scheduled saving, etc. It can also provide all-round task display styles and task table styles. Meet the needs of management and bidding diversity.

9. Flexible printing:

The font, font size, color, linearity, and width of printing and display can be adjusted arbitrarily, and headers, footers, and paper can be set arbitrarily. Supports both color and black and white printers.

The preview interface also supports all setting operations of the view, truly "what you see is what you get".

It can output single-code network diagrams, double-code network diagrams, horizontal bar diagrams, resource diagrams, etc. with designated fonts, specifications, drawings, etc. to adapt to different international and domestic bidding and project management requirements.

Updated features of the trial version on December 12:

1. Increase in engineering quantity data

Each underlying task has fields such as planned total project quantity, actual completed total project quantity, current planned quantity, current completed project quantity, current completion percentage, cumulative completion percentage, comprehensive unit price, and project quantity units. Requirements can be entered in both the task form and the task attribute box.

2. Project quantity progress update

Entering the completed project quantity this time will automatically update to the actual total completed project quantity, and automatically calculate the current and cumulative completion percentage.

Provides a list of project quantity update records. You can view the date, updater, and project quantity of each update. It also provides a modification function. After modification, the actual total completed project quantity will be automatically modified, and the current and cumulative completion percentages will be automatically calculated.

3. Cost statistics

Each underlying task automatically calculates the planned cost and actual completion cost based on the project quantity and comprehensive unit price.

Summary tasks automatically summarize cost data for all subtasks.

4. Summary task progress update

The automatic calculation rule for the progress of a summary task is the ratio of the planned cost and the actual completed cost of all subtasks.

5. Progress warning

l Update the completion percentage of all tasks and calculate the actual progress date based on the completion percentage.

lSelect a certain day as the inspection date

l Calculate the number of days between the inspection date and the actual progress date of the task

The 5-day lag is blue, the 15-day lag is yellow, the 30-day lag is orange, and the 45-day lag is red.

6. Network diagrams support hierarchical output.

You can optionally display task levels in dual-code network diagrams.

Lower-level tasks that are less than or equal to the selected level will be displayed in a double codename.

7. The network diagram supports displaying summary task tables

Summary tasks that are smaller than the selected level will appear in the task table on the left side of the dual-code network diagram.

8. The network diagram supports forward line display

Tasks displayed in dual-name network diagrams support showing forward lines based on progress.

Version: 2016 | Update time: 2015-09-22

Similar recommendations

Latest updates

Yili Construction Progress Network Planning/Project Management Software 2016 Free Trial Version Review

  • 1st floor Huajun netizen 2016-03-07 23:28:06
    Yili Construction Progress Network Planning/Project Management Software 2016 Free Trial Version has an interface design that is easy to use and has rich functions. I highly recommend it!
  • 2nd floor Huajun netizen 2018-10-29 22:06:15
    The free trial version of Yili Construction Progress Network Planning/Project Management Software 2016 is very easy to use, the download speed is very fast, and it is very convenient!
  • 3rd floor Huajun netizen 2018-04-22 04:00:20
    Yili Construction Progress Network Planning/Project Management Software 2016 Free Trial Version is Super Great! 100 million likes! ! !

Recommended products

Everyonealso likeThese:

+

This application has not passed real-name authentication and you can download it through the mobile assistant.

CancelOK