Speaking of the game City Skylines, I believe everyone is familiar with it. So how to lay electricity in the game? The author below will introduce to you the method of laying electricity in City Skylines. Friends who are interested can come and take a look. oh.
There are two types of facilities that can generate electricity in games - green power generation and resource-consuming power generation.
At the beginning of the game, the power facilities that can be used are limited. They can only build wind turbines (green power generation) and coal-fired power plants (power generation that consumes resources). The author recommends that you try not to use green power generation facilities.
The reason is that green power generation is not very stable and will be affected by weather conditions, and the CP value is too low. The maximum power of five wind turbines is equal to one coal-fired power plant. In terms of construction price, it is difficult for wind turbines to Compare this to coal-fired power plants.
Although in the long run, maintenance costs will be much lower, in the later stage, these preliminary power generation facilities will be eliminated, and just building three or four nuclear power plants can satisfy a population of about 10W.
As for the connection of electricity, we can see in the picture below that when you build a coal-fired power plant, a blue range will appear.
Everything within this blue range will have power supply, and all buildings will have a certain range of blue range. Therefore, the connection of the power tower only needs to be connected to the blue range, and there is no need to Go deep into it.
According to the author's plan, the power towers will be connected outside the grid, as shown below.
On the one hand, all the grids can be used in the building, and on the other hand, it will be more convenient to dismantle them later.
When the city grows, some unnecessary power towers can be demolished. In my map, it originally looked like the picture below.
Remove some unnecessary power towers and it will look like the picture below.
Just like this, even if part of the power tower is dismantled, power can still be transmitted everywhere.
Therefore, the benchmark for power transmission is as long as the blue range power grid is connected. Unless the distance between the two blue power grids is too far, a power tower will be needed to connect. An example is as shown below.
The above is the editor’s introduction to the method of laying electricity in the city skyline. I hope it can help everyone.