WeChat cannot be downloadedSuperman construction project progress network plan software, But just click on the upper right corner to select it in the browser or Safari!
Superman construction project progress network plan software

Superman construction project progress network plan software

  • Size: 6.49m
  • Language: Simplified Chinese
  • category: Engineering
  • System: WinXP/Vista/Win7/2000/2003

"Superman Construction Project Progress Network Plan Software" provides users with a tool for fast compilation of engineering project progress plans. It can help users quickly prepare the project progress plan, draw a horizontal diagram, network diagram (single -generation network diagram, double -code network diagram), make reasonable planning of the progress of the project plan, and generate the shortest plan map.

With the rapid development of my country's economy and technology, the popularization and extensive application of computer hardware and software in various fields, and the electrification of the progress of progress plans is already the majority of engineering and technical personnel, and the urgent needs of corporate managers. Especially in the bidding of construction projects, due to the urgency of time, the project schedule is used by manual preparation, and it consumes more time and is inconvenient to adjust. The drawn charts are not beautiful enough. Our company has developed the "Progress Plan" software for this. This software aims to provide users with a tool for rapidly preparing engineering project progress plans. It can help users quickly prepare the project progress plan, draw a horizontal diagram, network diagram (single -generation network diagram, double -code network diagram), make reasonable planning of the progress of the project plan, and generate the shortest plan map.

Software characteristics:

◆ This system fully considers the user's habits. Multi -screen input is adopted, that is, users can enter all content in different editing windows, generate the required graphics, and intelligent conversion between each picture.

◆ Users can easily modify various parameters of work in the working information table and various graphics windows such as duration, planning time, and the relationship between various work rooms. Essence And all operations only need to drag the mouse gently or double -click the mouse, which is very fast.

◆ The automatic cloth diagram function of the system can automatically distribute the dual code, single -generation number diagram, and horizontal diagram according to the information entered by the user in the working information table. And optimize the graphic of the cloth, generate a network diagram with simple graphics and the least cross point. According to their own habits, users can freely choose the color of the map in the network graph, define the length of the unit, and set the font in the chart.

◆ The sub -network function provided by the system realizes the graded management of the network diagram. It can be nested with the subnet. There is no limit to nested depth. The subnet and the main network can be stored separately. The modification of the subnet can be reflected in the previous network in real time.

◆ Using the flowing function provided by the system, users can quickly draw a standard and beautiful flowing water construction drawing.

◆ The system can check whether the working relationship entered by the user in real time is reasonable and conflict. Real -time calculation of various time parameters such as ES (earlier start time), EF (earliest completion time), LS (at the latest start time), LF (late completion time), TF (total time difference), FF (free time difference) and engineering projects Total construction period. Use different colors to represent key work, non -critical work, sub -engineering work and relationships, so that you can see it at a glance when you look at the network diagram.

◆ The system can accompany the labor dynamic curve when generating the bidding of the construction engineering and bidding for the construction of the construction engineering.

◆ The system provides the printing function that is obtained and obtained. Users can arbitrarily define the pages of the page, freely define the proportion of output, and adjust the number of printing pages to achieve puzzle printing.

◆ Provide any work grouping function, so that users can divide the work in the complex network plan graphs, clearly grasp the work plans of each part of the project, and then carry out unified coordination.

◆ Powerful work filtering function can be filtered out of the work required by the user according to the conditions of various combined conditions. It is of great significance for the subcontracting management of large projects, and also simplifies the user's operation.

◆ The powerful work information description function can display the relevant information descriptions of the work in the six different positions in the dual code figure, and the content, font, and color of the text can be adjusted. The work in the horizontal diagram can display the relevant information description of the work in eight different locations. It greatly improves the flexibility and practicability of the network diagram.

◆ Software has multiple calendar settings. Users can set a variety of different calendars. For different jobs to apply different calendars to ensure the independence of various tasks on work and rest days, and then provide accurate resource allocation of accurate resource allocation to accurate accurate resource allocation Time basis.

◆ Single -generation number format function. In the past, the single -generation number diagram had only one format, and the contents of each cell in the frame were fixed. Users need to show that some of the content they need cannot be performed. Users can not only choose the single -generation frame format, but also define the content, fonts, colors, and background color of each cell in the frame one by one, showing the content they need to be displayed, which greatly improves flexibility.

◆ With unlimited cancellation and recovery drawing function, it is convenient for users to draw.

◆ Various charts can be directly output into a variety of graphic format files (the files in the menu -output to file), including BMP, JPG, PNG, MNG, MNG, TIFF format.

Version: 2013 Standard Edition | Update time: 2013-12-10

Similar recommendation

Latest update

Superman Construction Project Progress Network Plan Software Review

  • 1st floor Huajun netizen 2021-01-19 19:24:38
    Superman construction project progress network plan software is very useful, thank you! Intersection
  • 2nd floor Huajun netizen 2017-10-11 12:28:58
    Superman construction project progress network plan software superb! Click 100 million likes! Intersection Intersection
  • 3rd floor Huajun netizen 2018-05-07 10:22:21
    Superman construction project progress network plan software is good as a whole, it is still very satisfactory, the installation operation is smooth! Guide to the installation steps very smoothly!