I believe everyone is familiar with PPT software, it is a good helper for making charts. So if we want to draw a mountain column chart, how should we do it? Below, the editor has brought you a tutorial on how to draw a mountain column chart using PPT. Let’s take a look.
Open PPT and insert a ppt default histogram.
Then modify the data. Keep only one category, multiple series.
Then remove the excess modification ingredients that come with it. Such as grid lines, titles, legends, coordinate axes, etc.
Draw an isosceles triangle below as an auxiliary diagram of the mountain for subsequent use. Draw it appropriately larger and higher, and set the fill transparency, such as 20%.
Now right-click on the triangle and select Edit Vertices.
Click on the top vertex edit point, right-click and select "Smooth Vertices". The vertex becomes an arc.
At this time, click on the vertex of the lower left corner of the triangle, a control handle will appear, and drag the control handle to the right to change it to an arc.
Likewise, do the same for the lower right vertex of the triangle. The mountain looks like it. Now select the mountain, ctrl+c to copy, click one of the pillars, and ctrl+v to paste.
Change the peak's fill color and copy it to other pillars. get initial results.
Click any column, right-click and select "Format Data Series" to open the formatting window on the right.
Finally, adjust the "Series Overlap" and "Category Spacing" in the formatting window on the right to get the final effect.
Above, I have shared with you the simple steps for drawing a mountain column chart in PPT. Friends in need should hurry up and read this article.