How to change the undo level in project2019-project2019 tutorial

Author: Qingchen Date: 2020-11-06

project2019
project2019-official version

Office software Storage size: 5.7 MB Time: 2020-08-07

Software introduction: project2019 is an efficient and practical professional local project management software developed by Microsoft. The official version of project2019...

Download now

Recently, some friends said that they are not sure how to change the undo level in project 2019. The editor below will explain to you how to change the undo level in project 2019. Friends in need can come and take a look. I hope it can help you.

First, open project2019 and click on file.

How to set the calendar to Hijri calendar in Project

Then click Options.

How to change the undo level in Project

Then click Advanced.

How to change the undo level in Project

Here you can see the undo level, the default is 20.

How to change the undo level in Project

Then change the undo level as needed, as shown in the figure.

How to change the undo level in Project

Finally, click OK to change the undo level.

How to change the undo level in Project

The above is the method of changing the undo level in project 2019 explained by the editor. Friends who don’t know how to do it can learn it.